The term “ Ufer” does not appear in the Code , but many in the industry use it. This is an electrode developed by . The use of concrete enclosed grounding conductors was added to the U. The NEC refers to this type of ground as . As stated in Article 2- Fine Print Note No.

CEC), “Systems and circuit conductors are grounded to limit voltages due to lighting, line surges, or unintentional contact with higher voltage lines, and to stabilize the voltage to ground .

It is used for many other things but the code required life safety ground is why it is there to begin with.

Ufer came up with was necessary because the site needing grounding had no. National Electric Codes must be consulted for acceptable methods in specific areas. UFER : Application: The UFER type ground is the preferred grounding electrode in those areas where it is recognized by local authority having jurisdiction.


Some localities are requiring Ufer grounds now that plastic water pipe is the norm. Prior to the placement of concrete, a 20-foot sec- tion of rebar must be installed in the lower section of concrete foundations. This section of rebar must be bonded to the reinforcing bars installed in the founda- tion ( ufer ground ) and stubbed out of the foundation at an accessible location for future use with the . Although the word “Ufer” is not used in the text of the code , NEC Section 250. A)(3), reads as follows: Electrodes permitted for grounding. An electrode encased by at least mm, (inches) of concrete, located horizontally near . Size of Largest Service Conductor.


Aluminum or Copper Clad Aluminum. Grounding Service - Terminating grounding electrode conductor NEC Code 250. YSHG Hyground Installation Video - Duration: 2:01. Building Lightning Protection - A critical extension of grounding.


Thank you for your question regarding UFER grounding, it is our pleasure to help . A)(2) specifically requires that the rebar in your concrete slab be bonded to . This material was turned over to then president, Alvah Sm. The electrode must comply with NEC 50. UFER GROUND : All new construction involving new services (or sub panels, in the case of multiple buildings) and new foundations are required to incorporate the.