Ufer ground

The Ufer Ground is an electrical earth grounding method developed during World War II. The technique is used in construction of concrete foundations. The term “ Ufer” does not appear in the Code, but many in the industry use it. Ufer came up with was necessary because the site needing grounding had no underground water table and little rainfall.


The principle of the Ufer ground is simple, it is very effective and inexpensive to install during new construction.

Concrete absorbs moisture quickly and looses moisture very slowly.

The mineral properties of concrete (lime and others) and their .

These rebar or this conductor must . As stated in Article 2- Fine Print Note No. CEC), “Systems and circuit conductors are grounded to limit voltages due to lighting, line surges, or unintentional contact with higher voltage lines, and to stabilize the voltage to ground . Conventional ground rods were unable to meet the required low-ground resistance requirements. It is also commonly referred to as “building steel”.


Whatever you call it, we are talking about the rebar in the concrete foundation. Cad Weld - Copper Ground to Rebar - Duration: 6:38. Home Inspection New Construction. Licensed Electrical Contractor.


We are being instructed to use the UFER ground in addition to the equipotential grounding system surrounding the building and attached to the rebar in the foundations. A second ground rod is required if you cannot test . The UFER grounding system is in addition to all other electrodes within the building being bonded together to form the grounding electrode system. The GEC shall be protected from physical damage. When (the minimum) ½” rebar is used and is bent vertically at degrees and exits the top of the footing, a minimum of 8” rebar above the footing is required to allow for connection . The method of splicing we used was excellent.


UFER GROUND : All new construction involving new services (or sub panels, in the case of multiple buildings) and new foundations are required to incorporate the concrete encased electrode into the grounding electrode system. UNDERGROUND INSTALLATIONS: All underground installations must be inspected prior. Size of Largest Service Conductor. Aluminum or Copper Clad Aluminum. During World War II, a retired Vice President of Underwriters Laboratories, Herbert G. Igloo shaped bomb storage vaults were being built, and possible static and lightning induced detonation problems were of concern.


Ground conductivity was poor, and to be effective . An interconnected concrete tower base can help the tower ground system. A major breakthrough in solving such problems was the development of the “ Ufer ground. This is emphatically not an acronym involving “ ferrous. Grounding Service - Terminating grounding .